Applying Pressure to Tame Problem Parts
Author: Gerald Conover, Product Manager
Source: ABC, Vol 7/ No 3, Summer 2002
Doc ID: 2002127
Year of Publication: 2002
Abstract:
Automated Blast Systems
Empire Abrasive Equipment Company
A manufacturer of pinion gears required a near-white-metal finish on steel billets being fed into a high-production forging process. Averaging 3 inches in diameter by 5.25 inches in length, the parts had to be cleaned at a rate of 5 feet per minute, non-stop, during 20-hour-per-day production cycles.
| Download PDF |
---|