I need a supplier to advise in modifying an old shotpeening machine

Eric Yeo
Production Engineer - ST Aerospace Engines Pte Ltd
Hi experts.

I have a machine which is currently taking a long time for the shot changing process. This machine is loaded with 4 different shots so that it can be changed when required. But due to a long time in service, the shot changing process has became very inefficient and ineffective. (roughly 5 to 6 hours per change)

I am looking at modifying this machine to achieve a shorter time for shot changing. Anyone has any contact based in Singapore who can help to advise on this?

Appreciate it. Thanks.