Previous Thread
Next Thread
Print Thread
#120 05/11/08 06:02 PM
Joined: Jan 2007
Posts: 3
R
ryszard Offline OP
Member
OP Offline
Member
R
Joined: Jan 2007
Posts: 3
Hello,

I want to learn what do you assume as a lot (for an individual part) while intensity verification
A day?
A shift?
A week?
Or -Anything else?

Joined: May 1999
Posts: 197
Member
Online Content
Member
Joined: May 1999
Posts: 197
A lot is defined as a part or group of parts that are shot peened one after another using the same machine without any changes to the set up.


Link Copied to Clipboard
Sponsored by Electronics Inc. © 2024 Electronics Inc. All Rights Reserved.
Powered by UBB.threads™ PHP Forum Software 7.7.5