Hi,

We have some old operation sheets for glass peening which there are listed tolerances for air pressure and shot flow. Am I allowed to adjust these parameters in the program (within the defined tolerances) to meet the almen strips requirement? Is this in accordance to AMS2430?


Best Regards
Mats Ledum
GKN Aerospace Norway
mats.ledum #1253 09/07/16 08:13 PM
Joined: Sep 2014
Posts: 16
C
Member
Offline
Member
C
Joined: Sep 2014
Posts: 16
The only AMS 2430 requirements for tolerances that I am aware of are 1) you must fall within the requirements of your customer, and 2) "3.10.2 intensity verification test strip measured arc heights shall be reproduced within +/-.0015 inch of the process parameter sheet and shall be within the intensity range for the part."

Your tolerances for your operation sheet air pressure and shot flow should be limited to maintain the proper intensity, and can be changed. I also recommend reading AMS2430 to verify that you are in compliance yourself.

Last edited by Charlie; 09/07/16 08:13 PM.
mats.ledum #1254 09/07/16 09:42 PM
Joined: Jan 2016
Posts: 4
M
Member
OP Offline
Member
M
Joined: Jan 2016
Posts: 4
Thank you Charlie.

So, if I understand you correctly you are saying that I can change the parameters to reach wanted intensity (within the customer requirements) if I have too low or too high intensity when verifying the test strips...?
Doesn't the change in parameters change the output of the shot peen operation?
Eg. if i experience too low strip verifications, i could raise the air pressure and lower the shot flow to reach the right arc height? But, doesn't this do something with the coverage of the actual part?

mats.ledum #1256 09/08/16 05:04 PM
Joined: Apr 1999
Posts: 341
Likes: 1
J
Member
Offline
Member
J
Joined: Apr 1999
Posts: 341
Likes: 1
Any time you change a machine parameter, air pressure, media flow rate, change a hose or nozzle, you must run a new saturation curve (4-strips etc.).
If you submitted a plan to your customer indicating any/all of those parameters then you may need permission to continue. Usually the customer wants you to satisfy the intensity and coverage requirements and no mentin is made of parameters. But, if you submitted parameters then you would be expected to re-submit for customer approval.

mats.ledum #1259 09/09/16 01:12 PM
Joined: Jan 2016
Posts: 4
M
Member
OP Offline
Member
M
Joined: Jan 2016
Posts: 4
Thank you for your answer Jack.
Will you be present at EI Shot Peening Seminar at Indianapolis this autumn?
I will attend and want to discuss this furthe than, if that's okey? smile


Best Regards
Mats Ledum
GKN Aerospace Norway
mats.ledum #1260 09/09/16 01:30 PM
Joined: May 1999
Posts: 197
Member
Online Content
Member
Joined: May 1999
Posts: 197
Example:
Process sheets state air pressure to be 40 with a tolerance
of +/- 5 you could adjust the setting anywhere from 40 to 50 without having to resubmit.

Ideally you should create your process by creating a tolerance box.

Create a saturation curve for the following parameters:
Air pressure low Shot flow low
Air pressure low Shot flow high
Air pressure high Shot flow low
Air pressure high Shot flow high

mats.ledum #1261 09/09/16 02:00 PM
Joined: Apr 1999
Posts: 341
Likes: 1
J
Member
Offline
Member
J
Joined: Apr 1999
Posts: 341
Likes: 1
Yes, I will be presenting Tuesday and Wednesday at the workshop in Indianapolis as well as many others. I will be in the SAE meetings all day Thursday. Perhaps we can visit Monday night or Tuesday night?

Walter #1312 01/12/18 07:41 AM
Joined: Jan 2018
Posts: 2
I
Member
Offline
Member
I
Joined: Jan 2018
Posts: 2
Originally Posted By Walter
Example:
Process sheets state air pressure to be 40 with a tolerance
of +/- 5 you could adjust the setting anywhere from 40 to 50 without having to resubmit.

Ideally you should create your process by creating a tolerance box.

Create a saturation curve for the following parameters:
Air pressure low Shot flow low
Air pressure low Shot flow high
Air pressure high Shot flow low
Air pressure high Shot flow high


Correct.


Link Copied to Clipboard