Water (and Media) Under the Bridge
Author: Lane Barnholtz | Senior Editor | Clemco Industries Corp.
Source: The Shot Peener magazine, Vol 36, Issue 1, Winter 2022
Doc ID: 2022009
Year of Publication: 2022
Abstract:
PROBLEM In 2018, a Munkebo customer of 15 years needed to recover
and recycle spent steel grit while blasting the concrete and
steel structures of a 900-foot bridge. The contractor had a
niche business in surface treating small-to-medium-sized
bridges. However, the work area on the riverbank beneath
this bridge was especially difficult to reach. Furthermore,
the work area was too small to fit most portable vacuum and
recycling systems, in addition to power and air generators.
As a final concern, the riverbank was unstable—too much
weight concentrated in one area could cause it to collapse.
| Download PDF |
---|